Going from bottom up lay and nail the remaining felt layers with a 2 inch overlap.
Repair overhang on a roof.
Remove rotted fascia remove the rotted section of fascia.
Roofing professionals should handle any large or complicated jobs.
Be sure to nail the tar strip on each felt layer to ensure maximum hold.
In addition to wood you also have the option of choosing a material like cellular pvc fiber cement aluminum or.
Make sure you also pick up enough pressure treated lumber to cut new shingle molds and rafters if necessary.
Roof sheathing comes in grid marked 4 by 8 foot sheets and should be installed perpendicular to the frame.
A roof shape is considered to be simple if it has six or fewer planes.
Remove shingle mold pry the narrow shingle mold from the fascia using a flat bar.
Start by stapling the 6 inch starter strip at the bottom section of roof leaving a 1 inch overhang on the eave to ensure drainage into the gutters.
But this overhang leaves the ends of the structural timbers which support the roof exposed to damp themselves.
Fill the seams where a rafter tail meets the cut end of a rafter with exterior wood filler.
And the simpler the roof the simpler the repair job.
Sheathing should be a minimum of 19 32 inch thick.
8d ring shank nails should be used instead.
To protect these timbers as well as to give a neat finish to the roof and support the guttering the eaves are finished off with boards.
Sand the filler and apply.
The national average roof repair cost is 887 with most homeowners spending between 353 and 1 436 most common small roof repairs cost between 150 and 400 labor runs around 45 to 75 per hour.
In some cases it may be necessary to remove a section of metal roof.
Be careful not to damage any nearby roof shingles or.
The typical thickness range for sheathing is 3 8 to 3 4 inch.
The more squares to be repaired the higher the cost.
Going from bottom up lay and nail the remaining felt layers with a 2 inch overlap.
Advice from a pro 1.
Roofs and roof repairs are measured in squares 10 foot by 10 foot areas that equal 100 square feet.
Never attach roof sheathing with staples.
If necessary enlist a roofing contractor to fill in the areas where shingles and roofing paper were removed.